Prelada Hospital
- Client:
Prelada Hospital
- ✎
- Year:
2024
Photo Gallery
Under the sponsorship of the European Funds for improving energy efficiency, Prelada Hospital underwent a total lighting overhaul, switching from fluorescent to LED technology, which meant a 51 per cent reduction in energy consumption. In addition to the lighting installed, Globaltronic‘s AXIS control system was also implemented, which contributed to an additional 31 per cent reduction in consumption. Translated with DeepL.com (free version)
The measures adopted allow for an 82 per cent reduction in energy consumption associated with lighting, with no need for intervention or maintenance for at least the next five years.
The project was studied in order to comply with ACSS standards in conciliation with standard EN-12464-1, as well as Decree Law 138-I..
The project was studied in order to comply with ACSS standards in conciliation with standard EN-12464-1, as well as Decree Law 138-I.
Installed Products:
ASEPTIC E, ASEPTIC S, MINI VITA, OPUS E PRIS, OPUS S PRIS, LACUS, ORBIS R, TAUPA, ALTUS R, TRIO, CITHARA EVO, AXIS control system